DCL Corporation, Toronto Project Gallery

Project Overview

This FRP tank stabilization project was initiated to address abnormal vibration issues affecting an industrial fiberglass reinforced plastic (FRP) tank. The vibrations posed a risk to the tank’s structural integrity, operational performance, and long-term reliability, requiring immediate engineering intervention

The objective was to identify the root cause of the vibrations and implement a durable reinforcement solution that would stabilize the tank while maintaining uninterrupted plant operations

Description of the Request

The client reported persistent abnormal vibrations in an operational FRP tank, raising concerns about potential structural fatigue, premature wear, and safety risks. Due to the critical nature of the tank, a solution was required that could be executed efficiently while ensuring long-term performance.

A comprehensive engineering assessment was conducted to analyze the tank’s design, operating conditions, and vibration behavior. The assessment identified key structural areas contributing to instability, requiring targeted reinforcement rather than full system replacement.

Engineering Approach

Our engineering team developed a custom FRP tank stabilization strategy focused on eliminating vibration at its source. The solution was designed to:

  • Reinforce critical structural areas of the FRP tank
  • Reduce vibration amplitudes to acceptable operating levels
  • Maintain compatibility with existing tank design
  • Minimize operational disruption during implementation

The approach balanced structural reinforcement with operational efficiency, ensuring the tank could continue performing under demanding industrial conditions.

Implementation

The reinforcement system was fabricated according to engineering specifications and installed on-site with precision. Installation was completed efficiently, following strict quality and safety protocols to ensure seamless integration with the existing FRP structure.

All reinforcement components were positioned and secured to maximize vibration control while preserving the original functionality of the tank.

Outcome

Following installation, vibration levels were reduced to normal operating ranges, restoring the tank’s structural stability and operational integrity. The reinforcement solution not only resolved the immediate vibration issue but also enhanced the tank’s resistance to future structural challenges.

This project successfully extended the service life of the FRP tank and improved overall system reliability without requiring costly replacement or extended downtime.

  • Created By:
  • Project Completed:
    July 2021
  • Location:
    Toronto, Ontario, Canada
Follow Us:

Project Gallery

Material Engineering

Lorem ipsum dolor sit amet consectetur. Ut tellus suspendisse nulla aliquam. Risus rutrum tellus amet facilisis.

Chemical Research

Lorem ipsum dolor sit amet consectetur. Ut tellus suspendisse nulla aliquam. Risus rutrum tellus amet facilisis.

Petroleum Engineering

Lorem ipsum dolor sit amet consectetur. Ut tellus suspendisse nulla aliquam. Risus rutrum tellus amet facilisis.

The Result of Project

The FRP tank stabilization solution delivered measurable improvements in performance, safety, and durability. By addressing the root cause of vibration through engineered reinforcement, the tank was returned to full operational capacity with increased long-term reliability

This project demonstrates our capability to deliver field-engineered FRP solutions that solve complex structural challenges while protecting critical industrial assets

OUR CLIENTS

PAST & CURRENT CLIENTS

Need FRP Tank Stabilization Support?

If your facility is experiencing FRP tank vibration, structural instability, or performance concerns, our team can help.
Contact Troy Dualam Services to assess your FRP systems and implement a reliable stabilization solution