Project Objective

This project focused on the custom fabrication of two double-walled FRP sumps required to support critical industrial processes. The primary objective was to deliver a containment solution capable of safely handling process fluids while meeting strict requirements for corrosion resistance, durability, and regulatory compliance.

An additional project priority was ensuring the sumps were completed ahead of a scheduled plant shutdown, allowing for smooth installation without impacting operations.

Technical Requirements and Constraints

The client required FRP sumps that:

  • Provided double-wall containment for enhanced safety
  • Resisted corrosion from aggressive process conditions
  • Integrated precisely into an existing system layout
  • Met stringent industry quality and safety standards

Because the sumps were part of a larger operational system, dimensional accuracy and material performance were critical to the project’s success.

Engineering Design and Client Collaboration

The project began with a detailed engineering phase. Our team developed comprehensive design drawings and material specifications outlining the construction of the double-walled FRP sumps.

  • Close collaboration with the client ensured that:
  • All operational requirements were fully understood
  • Design details aligned with site conditions
  • Safety and performance expectations were clearly addressed

This planning phase minimized risk and ensured fabrication could proceed without delays or rework.

Streamlined Fabrication and Schedule Acceleration

Following design approval, fabrication was prioritized to meet the client’s shutdown timeline. Production workflows were optimized to accelerate delivery while maintaining strict quality control standards.

Despite the expedited schedule, all fabrication steps adhered to internal manufacturing and inspection procedures to ensure long-term reliability and structural integrity.

Outcome: Shutdown-Ready FRP Sumps

The two custom double-walled FRP sumps were completed ahead of schedule and delivered prior to the planned plant shutdown. This allowed installation to proceed smoothly, avoiding any disruption to plant operations.

The finished sumps met all design specifications and were fully prepared for immediate integration into the client’s system.

Project Results and Operational Benefits

The project was successfully completed within the required timeframe and to exact specifications. The final solution delivered:

  • Seamless integration with existing infrastructure
  • Long-term corrosion resistance
  • Enhanced containment safety through double-wall construction
  • Improved operational reliability and efficiency

The client received a durable, low-maintenance FRP solution designed to perform reliably over the long term.

  • Created By:
    Jasmin Leblanc
  • Project Completed:
    July 2022
  • Location:
    Gatineau, Quebec, Canada
Follow Us:

Project Gallery

OUR CLIENTS

PAST & CURRENT CLIENTS

Need Custom FRP Containment Fabrication?

If your facility requires precision-engineered FRP sumps or containment systems designed to meet strict operational and scheduling requirements, our team can deliver a tailored solution.

Contact Troy Dualam Services to discuss your custom FRP fabrication needs.