Description Of The Request

The project involves the assembly and joining of a two-piece insulated tank. This tank, which was manufactured by our sister company, requires on-site joining at the client’s facility. Due to the complexity of the tank’s structure, including the presence of insulation between the walls, the joining process must be carefully executed to ensure a secure and seamless connection. The client requires a robust solution that ensures the tank’s structural integrity and maintains the effectiveness of the insulation, crucial for its operational purpose.

Outcome

To address the client’s needs, our team will conduct a thorough site inspection to understand the logistical requirements and constraints of the location. We will then coordinate and deploy a skilled team from Troy Dualam Services to perform the on-site joining. The process will be carried out according to the highest industry standards to ensure durability and functionality. Special attention will be given to minimizing the challenges typically associated with working with fiberglass, such as handling, alignment, and surface preparation. Our technicians will use specialized techniques and equipment to ensure that the tank’s two sections are perfectly aligned and securely bonded, without compromising the insulation or the tank’s overall performance. By employing meticulous workmanship and planning, we aim to minimize disruptions and ensure a smooth, efficient completion of the joining process.

  • Created By:
    Jasmin Leblanc
  • Project Completed:
    January 2023
  • Location:
    Salaberry-de-Valleyfield, Québec, Canada
Follow Us:

Project Gallery

The Result of Project

The project was successfully completed, ensuring a seamless and secure joining of the two-piece insulated tank at the client’s facility. Our team’s thorough preparation and attention to detail resulted in a flawless installation, with the tank’s structure and insulation fully intact. By minimizing the typical challenges associated with working with fiberglass, we were able to complete the work efficiently and with minimal disruption to the client’s operations. The tank was fully assembled to meet industry standards, providing the client with a durable and reliable solution that maintains both its structural integrity and insulation properties. The project was delivered on time, ensuring that the client could integrate the tank into their system without delays.

OUR CLIENTS

PAST & CURRENT CLIENTS